Are you a VA?  Browse jobs | Apply as a VA →
    Industry: Solar & Energy

    Filipino Solar Admin VAs for Australian Installers

    Trained on OpenSolar, Pylon and SolarPlus. STC paperwork, DNSP applications, $7.2B battery rebate processing, finance apps, fully managed from Australia.

    4.9/5from 200+ Australian founders
    OpenSolar / Pylon trained CER REC compliant Live in 14 days
    Get matched in 60 seconds

    Optional, we'll SMS you the booking link

    Where AU solar installers leak hours every week

    The $7.2B battery rebate windfall is a 2-year window

    The federal battery rebate (Dec 2025 to 2027) creates a once-in-a-decade demand surge. Installers who can scale admin to absorb the volume will own the next 24 months. Installers who can't won't.

    STC paperwork drowns sales reps

    Each install equals STC lodgement, supporting docs, signed STC assignment, CEC accreditation evidence. Done badly equals lost rebate. Done well equals recovered cash flow in days.

    DNSP applications eat sales pipeline

    Pre-approval gates, supply data, single-line diagrams, electrical works approvals. One missing field equals a 4-week delay. Customers walk.

    Finance applications turn warm leads cold

    Brighte, Plenti, Humm: each with their own application portal, credit assessment cadence, install scheduling tie-in. Whoever owns the chase, owns the close rate.

    What our solar VAs do

    STC & CER Compliance

    • STC (Small-scale Technology Certificate) lodgement via REC Registry
    • CER (Clean Energy Regulator) compliance evidence collation
    • Signed STC assignment chasing
    • Solar Accreditation Australia (SAA) installer record matching
    • CEC product compliance verification

    DNSP & Grid Applications

    • DNSP (Distributed Network Service Provider) pre-approval applications
    • Single-line diagram coordination
    • Electrical Works Request submissions
    • Embedded generation application admin
    • Connection approval status tracking

    Customer & Finance Operations

    • Lead qualification from website and Google LSA
    • Brighte / Plenti / Humm finance application processing
    • Credit assessment status chase
    • Install scheduling coordination
    • Customer status comms (week-by-week)

    Sales Admin & Quote Production

    • OpenSolar / Pylon / SolarPlus quote build
    • Roof data and design review prep
    • Council application support (if needed)
    • Multi-product bundling (solar + battery + EV charger)

    Post-Install

    • Warranty registration with manufacturer
    • Customer onboarding into monitoring portals
    • Performance check at 30/90 days
    • Online review request automation
    • Referral program admin

    Rebate Processing

    • State rebate applications (SolarVic, NSW Empowering Homes, SA Home Battery, QLD Power Trip)
    • Federal battery rebate processing
    • Documentation chase for approval
    • Customer status updates on rebate stage

    Tools your solar VA already knows

    CRM / Quote

    • OpenSolar
    • Pylon
    • SolarPlus
    • SimPro (cross-trades)

    Job mgmt

    • ServiceM8
    • AroFlo
    • Tradify

    STC / Compliance

    • CER REC Registry
    • STC Generator (REC Agents Association)
    • Form Bird
    • Greenbot

    Finance

    • Brighte
    • Plenti
    • Humm
    • BNPL platforms

    Rebate portals

    • SolarVic
    • NSW Empowering Homes
    • SA Home Battery
    • QLD Power Trip

    Lead platforms

    • Google LSA
    • SolarChoice
    • Solar Quotes
    • Hipages

    How we get your VA live in 14 days

    1

    Brief us

    Tell us your tools, hours and solar & energy workload.

    2

    We shortlist

    Industry-matched VAs, vetted and tested, in 5 days.

    3

    You hire

    Pick your VA. Live in 14 days. 14-day risk-free trial.

    What Australian solar installers say

    "We absorbed a 40% volume increase in the first 90 days of the battery rebate without adding a single sales rep. The VA absorbed all the rebate admin."

    ML
    Mike L.
    Director, residential solar installer, Newcastle

    "STC rejection rate dropped from 8% to under 1% with systematic evidence collation. That's straight cash to our bottom line."

    SP
    Sarah P.
    Operations Manager, mid-tier installer, Adelaide

    "DNSP application time dropped from 6 weeks to 11 days on average. Customers don't walk anymore."

    TB
    Tom B.
    Owner, electrical + solar contractor, Gold Coast

    Solar installer FAQs

    Absorb the battery rebate without burning out

    Brief us in 15 mins. Your VA is live in 14 days. 14-day risk-free trial.